Westminster Chapel

Our work as Cost Consultants and Contract Administrators was on the first phase of a long term refurbishment of this Grade 2 listed building

Project filed in Culture and heritage, Unusual

The first phase comprised the refurbishment of the main worship space to open up the space for future worship and other uses such as nursery provision, music events and conferences. The work included the provision of a new more welcoming entrance area together with a cafe at the entrance for use by members of the general public.

A major challenge was the provision of acoustic panelling at high level and the redecoration of the decorative ceiling all achieved with the use of spider cranes saving a considerable amount of scaffolding over the very large area.

Awards

  • Shortlisted Architects Journal Retrofit Awards 2023

  • Winner, Conservation New London Architecture Awards, 2024

An excellent refurbishment of the existing space opening the Chapel for a variety of uses and encouraging the public to enter.

Colin Hayward
Colin Hayward Director

Let's talk

Contact us today to discuss your project

Get in touch

Related projects